Project included:
- All new Title-24 Compliant LED Lighting at the 1st & 2nd Floor Build-out
- Installation of a new 3000A Main Service with PG&E Administration & Coordination
- Installation of a 150kw and 500kw UPS Systems
- Installation of a 1.0MW Diesel Generator for Critical Load Back-up Power
- Power & Connections for (7) New Roof-top VRF HVAC Condensers and (21) VRF Fan Coil Units
- Power & Connections for (2) New Equipment Yard 140 Ton Chillers
- Power & Connections for (20) Server Room HVAC CRAC Units
- Power & Connections for (5) New ChargePoint Dual 40A EV Charging Stations
- Power & Connections for (55) 3.5kw Lab Server Racks
- Power & Connections for (112) 3.5kw Main Lab Server Racks